For safety teams

Your ISO 26262 program.
Without the manual work.

Safety teams spend months producing the traceability matrices, deviation records, and audit evidence their certification requires. Coda generates them automatically from every analysis run, and evaluates the 68 AUTOSAR rules no static analysis tool can fully check. So your engineers spend time on engineering, not documentation.

Book a demoSee the product
AUTOSAR C++14397 rules · AST + Coda
Live
MISRA C++:2023179 rules · C++17
Q3 2026
IEC 61508 / ISO 26262Certification artifacts
Roadmap
IEC 62304Industrial + medical devices
Roadmap
ISO/PAS 8800AI in road vehicles
Roadmap

Certification prep
is eating your program

The software is written. The analysis tools have run. But the work that actually gets you to certification: the documentation, the evidence trail, the deviation management. It still happens manually, in spreadsheets and Word documents, by engineers who should be doing something else.

01

Traceability built by hand

ISO 26262 Part 6 requires a traced chain from requirement to rule to code to compliance status. Your team assembles this manually from static analysis output, every release cycle.

02

Deviations managed in email

Every formally approved rule deviation needs a justification, risk assessment, compensating measures, and sign-off. Most teams track these in shared documents with no expiry management or audit trail.

03

No visibility until the audit

Teams find out where they stand on certification readiness when auditors tell them, often late in the program, when the cost of fixing it is highest.

04

Semantic rules not fully checked

68 AUTOSAR rules are non-automated or only partially automated. They require human judgment, not just syntax checking. They get reviewed manually, inconsistently, or not at all.

Typical ISO 26262 cert prep timeline
Code complete
Static analysis
2w
Traceability
Manual documentation
6w
Deviations
Justification writing
4w
Safety case
Manual evidence assembly
8w
Total manual documentation work
18+ weeks
With Coda
Traceability and deviation records generated on every analysis run. Safety case fragments drafted automatically. Manual work reduced by ~80%.

Three things you do manually.
Coda does them automatically.

01

Deviation records

Written in Word or email. No central register. Expiry dates tracked manually. Auditors request evidence and you search through inboxes.
Every deviation formally logged with justification, compensating measures, approver, and expiry. Expiry alerts 30 days ahead. Full audit trail. One-click export per deviation record.
02

Traceability matrices

Assembled manually from static analysis output after every release. Spreadsheet updated by hand. Takes a senior engineer 4–6 weeks.
Generated automatically on every Coda analysis run. Requirement to rule to code location to compliance status. ISO 26262 Part 6 format. Export to PDF or CSV in one click.
03

Certification readiness

Unknown until the audit. Findings surface late in the program. Cost of remediation is highest at this point.
Live readiness score updated on every run. Blockers surfaced immediately. Trend visible over 30 days. Safety manager sees exactly where the program stands, every week, not at audit time.
AV-Platform · Certification Readiness
74%
Rules covered
371
Compliant
352
Violations
23
Deviations
8
Certification blockers
14 of 23 violations are HIGH severityview
2 deviations expiring within 30 daysrenew
Traceability report not exportedgenerate

Know where you stand.
Every week, not at audit time.

The certification readiness dashboard gives safety managers a live view of program status: violations, deviations, traceability coverage, and the specific blockers preventing sign-off.

Updated on every run

Readiness score recalculates automatically after every Coda analysis. No manual status updates.

Blockers surfaced immediately

Expiring deviations, unresolved violations, and missing artifacts flagged before they become audit findings.

30-day trend

See whether the program is improving week-over-week. Evidence of systematic progress to share with program management.

The ISO 26262 evidence document.
Generated, not written.

Every Coda run produces a full traceability matrix in ISO 26262 Part 6 format: rule to code location to compliance status to evidence. What your team currently assembles manually over weeks, available instantly.

AV-Platform · Traceability Report
AUTOSAR C++14 (AP R19-03) · Generated 2026-03-27 · DRAFT
RuleDescriptionCheckerEvidenceStatus
A10-0-1Public inheritance shall implement "is-a" relationshipsCODAvehicle_controller.cpp:42 · run 2026-03-27VIOLATION
A10-0-2Membership or non-public inheritance for "has-a"CODADEV-001 · J. Smith · 2026-01-15DEVIATED
A9-5-1Unions shall not be usedASTAll modules · run 2026-03-27COMPLIANT
A27-0-1Inputs from independent components shall be validatedCODAradar_input.cpp:156 · run 2026-03-27VIOLATION
A12-4-1Destructor of base class shall be public virtualASTAll modules · run 2026-03-27COMPLIANT
CODA: semantic rules not caught by static analysis
AST: deterministic static analysis rules

Built for where the industry is heading.

Starting with AUTOSAR C++14, the current standard for safety-critical C++ development. Expanding to MISRA C++:2023 and the emerging standards for ML-integrated and physical AI systems.

Live now
AUTOSAR C++14
397 rules. AST layer fully automates 329 rules. Coda evaluates the 68 rules no static analysis tool can fully check.
Available now
Coming Q3 2026
MISRA C++:2023
The unified successor standard incorporating AUTOSAR guidelines. Targets C++17. Same Coda engine, same traceability and deviation management. Same report format.
Q3 2026
Roadmap
Physical AI + Medical
ISO/PAS 8800, SOTIF, UL 4600, IEC 62304. Compliance at the C++ model boundary for ML-integrated systems: autonomous vehicles, humanoid robotics, medical devices.
Roadmap
397
AUTOSAR rules evaluated
68
Rules static analysis can't fully cover
≥80%
True positive rate
On-prem
No code leaves your network
Book a demo

See Coda run on
your codebase.

We'll walk through the full pipeline against a real C++ codebase: violations, traceability report, deviation manager, and certification readiness dashboard.

Usually a 30-minute call. We bring the demo environment.